The new Marine Terminal is located on the north shore of the south arm of the Fraser River, at one of the widest and deepest sections of the river. The wharf is located in an area that is zoned for heavy industrial use including state-of-the-art mooring and offloading technologies. The terminal is designed to accommodate both small barge shipments as well as large overseas vessels based on seasonal YVR fuel demand.

The Fuel Receiving Facility is located on industrial zoned, Vancouver Fraser Port Authority land adjacent to the Marine Terminal. The facility includes six steel above-ground storage tanks with a total capacity of eighty million litres. A 500-metre-long underground pipeline transfers offloaded aviation fuel from the marine terminal to the storage tanks.

The pipeline is thirteen kilometres long and 355 millimetres (about 14 inches) in diameter. It is buried approximately ten metres underground for most of its route, and at least 2.5 metres underground along Bridgeport Road. The pipeline consists of specialty steel pipe manufactured in accordance with the American Society for Testing and Materials (ASTM) Standard A53 (Grade B) and was installed to the standards established by the Canadian Standards Association (CSA) Standard Z662 for Oil and Gas Pipeline Systems. The pipeline installation and operation are regulated by the BC Energy Regulator.

Partner with Us on Future Projects